Edit Template

Pune Sambhajinagar Expressway – Latest News, Route Map, Status & Updates

By Sambhajinagarkar – The First Digital Platform of Sambhajinagar | Infrastructure & Development News

The Pune Sambhajinagar Expressway is one of the most ambitious infrastructure projects in Maharashtra, aimed at transforming connectivity between Pune and Sambhajinagar (Sambhajinagar). Developed by the National Highways Authority of India (NHAI) in collaboration with the Maharashtra Government under the Bharatmala Project, this expressway is expected to significantly reduce travel time, boost regional development, and attract large-scale investments.

This article covers the latest news, project details, route map, land acquisition status, village list, benefits, and FAQs related to the Pune Sambhajinagar Expressway.


Pune Sambhajinagar Expressway – Key Details

Particulars Details
Estimated Cost ₹10,000 Crore
Project Length Approx. 225 km
Lanes 6 or 8 lanes
Status DPR Prepared; Land Acquisition Underway
Right of Way (RoW) 70 metres
Deadline Not Finalised
Project Owner National Highways Authority of India (NHAI)
Project Model EPC (Engineering, Procurement & Construction)

Pune Sambhajinagar Expressway – Highlights

The Pune Sambhajinagar Expressway is being designed as a high-speed, access-controlled corridor with the following key highlights:

  • Planned seamless connectivity with the 701 km Mumbai–Nagpur Expressway
  • One of the top six expressways proposed to enhance Maharashtra’s road infrastructure
  • Travel time between Pune and Sambhajinagar to reduce from 4–5 hours to just 2 hours
  • Designed speed capacity of 120–140 km/h
  • Expressway route passing through Ahmednagar and Paithan regions
  • Improved connectivity for rural and semi-urban areas along the corridor

Pune Sambhajinagar Expressway – Current Status Update

As per the latest updates, the Pune Sambhajinagar Expressway is in the planning and pre-construction phase. The Detailed Project Report (DPR) has been prepared, and authorities are actively working on land acquisition and route finalisation.

The NHAI, along with the Maharashtra Government, is coordinating with district administrations to complete legal formalities. Once land acquisition and approvals are completed, full-scale construction work is expected to begin.


Pune Sambhajinagar Expressway – Land Acquisition Details

Land acquisition is a critical component of this mega infrastructure project. The government has identified several talukas where land procurement is underway:

  • Bhor Taluka
  • Daund Taluka
  • Purandar Taluka
  • Haveli Taluka
  • Shirur Taluka

According to reports:

  • Landowners and villagers will receive full and fair compensation
  • Estimated land acquisition cost is around ₹6,000 Crore
  • Additional land may be acquired to connect the expressway with major state highways

This process is expected to play a key role in accelerating regional infrastructure growth.


Pune Sambhajinagar Expressway – Route Map Overview

The Pune Sambhajinagar Expressway will connect three major districts:

The expressway will pass through 44 villages across five major talukas, improving accessibility and economic opportunities in these areas.


Pune Sambhajinagar Expressway – Village List

Bhor Taluka

  • Mauje Kanjale
  • Varve Budruk
  • Kasurdi Kh. Ba
  • Kasurdi Gu. M.

Purandar Taluka

  • Shivre
  • Thapewadi
  • Varwadi
  • Garade
  • Kodit Kh.
  • Chambli
  • Pawarwadi
  • Saswad
  • Hiwre
  • Dive
  • Kalewadi
  • Sonori

Haveli Taluka

  • Alandi-Mhatobachi
  • Tarde
  • Valti
  • Shindwane
  • Sortapwadi
  • Koregaon-Mool
  • Bhawarpur
  • Hingangaon

Shirur Taluka

  • Mirwadi
  • Dahitne
  • Deokarwadi
  • Pilanwadi
  • Patethan
  • Telewadi
  • Rahu
  • Vadgaon Bande
  • Takli
  • Panvali
  • Uralgaon

Other Talukas

  • Satkarwadi
  • Dahiwadi
  • Amble
  • Karde
  • Babhulsar Khu.
  • Ranjangaon Ganapati
  • Karegaon
  • Chavanwadi
  • Golegaon

Pune Sambhajinagar Expressway – Major Benefits

1. Reduced Travel Time

The expressway will cut travel time between Pune and Sambhajinagar from 4–5 hours to nearly 2 hours, making inter-city travel faster and more efficient.

2. Enhanced Connectivity

The project will significantly improve connectivity between cities, towns, and villages, supporting trade, tourism, and daily commuting.

3. Economic Growth Boost

Faster movement of goods and people will strengthen industrial, agricultural, and logistics sectors, creating employment opportunities.

4. Improved Road Safety

Modern expressway design with wider lanes, better signage, and advanced traffic management systems will ensure safer travel.

5. Increased Investment Opportunities

Improved infrastructure will attract real estate, industrial, and commercial investments along the expressway corridor.


Pune Sambhajinagar Expressway – FAQs

1. What is the Pune Sambhajinagar Expressway?

The Pune Sambhajinagar Expressway is a 6 or 8-lane access-controlled highway connecting Pune with Sambhajinagar under the Bharatmala Phase II project.

2. What is the total length of the expressway?

The total length of the Pune Sambhajinagar Expressway is approximately 225 kilometres.

3. What is the estimated cost of the project?

The estimated project cost is around ₹10,000 Crore.


SEO Conclusion: Pune Sambhajinagar Expressway Latest Update

The Pune Sambhajinagar Expressway is set to redefine transportation and economic development in Maharashtra. With reduced travel time, improved safety, and enhanced connectivity, this expressway will play a crucial role in the growth of Sambhajinagar and surrounding regions.

Stay connected with Sambhajinagarkar.com for the latest news, updates, and ground reports related to the Pune Sambhajinagar Expressway and other major developments in Sambhajinagar.

Leave a Reply

Your email address will not be published. Required fields are marked *

Popular Articles

Business Recent Posts

Wellness Recent Posts

  • All Posts
  • Business
  • Calendar
  • Culture
  • Digital Marketing
  • Editorials
  • Kids Zone
  • Lifestyle
  • Marketing
  • News
  • PRESS RELEASE
  • Sports
  • Study
  • Technology & Business
  • Visa, Immigration & Travel
    •   Back
    • English
    • Hindi
टोयोटा किर्लोस्कर toyota-invests-25000-cr-sambhajinagar

टोयोटा किर्लोस्कर मोटर (TKM) आणि महाराष्ट्र सरकार आज एक महत्त्वपूर्ण करारावर स्वाक्षरी करणार आहेत. या करारानुसार, टोयोटा किर्लोस्कर मोटर (TKM)...

sambhajinagar-toyota-project-20000cr

मराठवाड्यातील विकासाला नव्याने गती देण्यासाठी छत्रपती संभाजीनगरमधील ऑरिक सिटीमध्ये मोठा प्रकल्प उभारण्याचे संकेत मिळाले आहेत. टोयोटा किर्लोस्कर मोटर्स (TKM) या...

हायकोर्टाचे शिक्कामोर्तब: छत्रपती संभाजीनगर आणि धाराशिव नामांतराच्या निर्णयावर आक्षेप घेणाऱ्या याचिका फेटाळल्या.

छत्रपती Sambhajinagar, धाराशिव नामांतरावर हायकोर्टाचे शिक्कामोर्तब, आक्षेप घेणाऱ्या याचिका फेटाळल्या! औरंगाबाद शहराचे छत्रपती संभाजीनगर आणि उस्मानाबादचे धाराशिव असे नामांतर करण्याच्या...

JSW ग्रीन मोबिलिटीचे ₹27,200 Cr निवेश, 5,200+ रोजगार आणि 6L वाहनांची निर्मिती.

महाराष्ट्रातील औद्योगिक क्षेत्राला मोठी चालना मिळाली आहे. राज्य मंत्रिमंडळाने मंगळवारी सात प्रमुख प्रकल्पांना मंजुरी दिली असून, यासाठी एकूण ₹81,000 कोटींची...

संभाजीनगरकर